A collection of resources for those working on campus.

Explore

Ammonia (under revision)

Capital project documentation

  • Procedures to follow in order to maximize output and meet strategic needs.

Confined space entry program

  • Procedure - for partially or entirely confined spaces.

Construction site safety guide

  • To raise contractors' awareness of their team's responsibilities in ensuring safety and training and the importance of health and safety on the construction site.

Design and construction standards

  • Standards for all University of Ottawa renovation or construction projects.

Furniture standards

  • For office or reception-area furniture, meeting tables and computer tables, etc.

Lockout procedure

  • To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidentally while an employee is working on it.

Mould control program

  • To respond rapidly and effectively to water damage and prevent undesirable mould growth. 

Moving procedure

  • The administrative officer or his or her delegate acts as coordinator for moves.

Procedure for maintenance work on fume hoods systems

  • Measures to guarantee proper fume hoods maintenance while protecting Physical Resources Service employees against exposure to toxic substances.

Project delivery manual

  • Project delivery processes used by the Physical Resources Service.

Roof access procedure

  • Minimum safety standards and levels of responsibility for all who may need access to roofs on campus.

Sign system standards

  • Standards for common sign types, including building directories, room and laboratory identification, life safety signage and hazard and prohibition signage.