The university provides notice of service interruption in the event of a planned or unexpected disruption in the facilities or services typically used by people with disabilities to access campus goods and services. 

About service alerts and interruptions

Notices of service interruption include the reason for the disruption, the anticipated duration, a description of alternate facilities or services (if available), as well as accessible routes for making one’s way to these alternate facilities and services. The notice is placed in conspicuous campus locations and, when appropriate, on this site.

The University of Ottawa is proud to offer an inclusive environment to its entire community. We invite you to send us comments and suggestions on accessibility that will help us to keep on improving the level of accessibility campus-wide.  For more information on accessibility at the University of Ottawa, please visit the Accessibility Hub.

The Accessibility for Ontarians with Disabilities Act states that all employers must provide emergency response information in an accessible format to all employees with a disability that requires an accommodation. If an employee has an emergency response plan in place, please ensure that you revisit the emergency response plan with the employee in light of the temporary disruptions/maintenance. If an employee submits a new request for an accommodation due to a disability, the employee should discussion their request with their supervisor and/or the Human Resources Department.

If employees require advice on emergency preparedness or assistance with developing a personal emergency plan, they should inform their supervisor and/or the Human Resources Department. The Emergency Management Office may be consulted should subject matter expertise be required.

Active interruptions notices

Long term interruptions

Long term interruption notices are mostly due to construction projects on campus.

Alta Vista Campus 

Project: Construction of the Advanced Medical Research Centre
Project Manager: Sylviane Charette
Project Status: Active construction site
Alternative route: Not applicable for this project.
Related Interruption notices
Parking Lot H at RGN will close at midnight on May 10, 2024 and remain closed for the duration of construction (approx. October 2026).
Alternative parking is available for permit holders and visitors. View alternative options. 
When visiting the Alta vista campus, we strongly recommended using the uOttawa inter-campus shuttle service
Loading dock will remain open during construction.

STEM Complex (STM)-150 Louis Pasteur

Ongoing projects at this building:

Project: 048 - CFI - Sanchez / Charron 43007- (w/ Polytechnique) (IF2023)
Project Manager: Alexandros Reklitis
Project Status: Active construction site
Anticipated construction completion date: 3/27/2026
Alternative route: Not applicable for this project.

Project: 048 - CFI 40178 - STEM 5th Floor Reno -Jabbour (IF2020)
Project Manager: Alexandros Reklitis
Project Status: Active construction site
Anticipated construction completion date: 3/30/2026
Alternative route: Not applicable for this project.

Project: 048 - CFI Lessard (IF2023) - SSMART
Project Manager: Alexandros Reklitis
Project Status: Active construction site
Anticipated construction completion date: 9/25/2026
Alternative route: Not applicable for this project.
 

Morisset Hall (MRT) - 65 University

Ongoing project at this building:

Project: MRT Elevator A/B/C/D Modernization
Project Manager: Martin Faubert
Project Status: Active construction site
Anticipated construction completion date: 4/15/2026
Alternative route: Not applicable for this project.

Parking Lot B

Project: Full closure of parking lot B.
Project Manager: Martin Faubert
Project Status: Active construction site
Alternative route: Not applicable for this project.
Related Interruption notices
Parking Lot B will close at 7:00 am on April 27, 2026 and remain closed for the duration of construction (approx. October 2026).
Building envelope work will take place at 143-145 Séraphin-Marion and Alex Trebek Hall, as well as a drainage system installation in parking lot B. Parking office will reach out to parking pass holders to provide alternate parking. Please see attached document

Montpetit Hall (MNT) - University 125

Project: Construction work will occur in both locker rooms on level 0
Project Manager: Dongxu Liu 
Project Status: Active 
Alternative route: Not applicable for this project.
Related Interruption notices
Locker access in both changing rooms on level 0 will be impacted. Some lockers will be temporarily removed. The existing access gates will also be blocked. Please see attached floor plan for alternate routes. Signage will also be posted on-site to direct traffic. 

Tabaret Hall (TBT) - Cumberland 550

Project: Occupation of a portion of the Great Lawn and Rotunda (level 1)
Project Manager: Kyle Clemens 
Project Status: Active 
Alternative route: Not applicable for this project.
Related Interruption notices
We will be occupying a large portion of the Tabaret Great Lawn during the construction period; therefore, that area will be inaccessible to campus occupants. We will also be occupying a portion of the Tabaret Rotunda on Level 1 with a scaffolding tower. All entrances will remain operational during the construction, with the exception of specific shutdowns that will be coordinated with facility management and building occupant representatives. Wayfinding and signage will be posted

Project: Noisy or disruptive construction activities outside regular working hours
Project Manager: Kyle Clemens 
Project Status: Active 
Alternative route: Not applicable for this project.
Related Interruption notices
Elevated noise levels and temporary disruptions may occur during the work period. These activities will take place outside regular working hours for the duration of the construction project. No building systems will be affected

Louis-Pasteur Street (between University Private and Thomas More Private)

Project: Partial then full closure of Louis-Pasteur Street between University Private and Thomas More Private
Project Manager: Martin Faubert 
Project Status: Active 
Alternative route: see details below
Related Interruption notices
From May 4 to May 10, 2026, one lane on Louis-Pasteur Street between University Private and Thomas More Private will be reduced to allow for work.

  • From May 11 to August 6, 2026, Louis-Pasteur Street between University Private and Thomas More Private will be fully closed, affecting vehicle traffic on campus. The sidewalk on the Brooks Residence side will remain open for pedestrian access.
  • An alternate route will be in place Monday to Friday from 7:30 a.m. to 5:30 p.m. to allow limited vehicle access on campus. Vehicle access to Louis-Pasteur Street via Marie-Curie Private will not be possible outside of these hours.From May 4 to May 10, 2026, one lane on Louis-Pasteur Street between University Private and Thomas More Private will be reduced to allow for work.
  • From May 11 to August 6, 2026, Louis-Pasteur Street between University Private and Thomas More Private will be fully closed, affecting vehicle traffic on campus. The sidewalk on the Brooks Residence side will remain open for pedestrian access.
  • An alternate route will be in place Monday to Friday from 7:30 a.m. to 5:30 p.m. to allow limited vehicle access on campus. Vehicle access to Louis-Pasteur Street via Marie-Curie Private will not be possible outside of these hours.

    Please refer to the attached document for more details

Short term interruptions

Building affected:  LMX-CRX - Lamoureux & Learning Crossroads - Jean-Jacques Lussier 145
Shutdown details: The door will be inaccessible due to emergency maintenance work
Duration of interruption: Thu, 03/26/2026 - 10:00
Duration of interruption: TBD
Impact: Occupants requiring an accessible entrance will need to use the main CRX entrance
For more information, please contact: : Patrick Labrèche at [email protected]

Building affected:  MULTIPLE buildings will be affected – ARC - CBY - STE
Shutdown details: Floor Maintenance and Annual Cleaning
Duration of interruption: Tue, 06/16/2026 - 23:00
Duration of interruption: Fri, 08/28/2026 - 07:00
Impact: Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to buildings will remain available at all times..
Additional Information: : Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]

Building affected:  MULTIPLE buildings will be affected – DRO - MCE - STM
Shutdown details: Floor Maintenance and Annual Cleaning 
Duration of interruption: Wed, 06/17/2026 - 23:00
Duration of interruption: Tue, 08/18/2026 - 07:00
Impact: Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to buildings will remain available at all times.
Additional Information: : Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]

Building affected:  MULTIPLE buildings will be affected – BSC - GNN - MRN
Shutdown details: Complete electrical shutdown of normal power circuits. Emergency power will not be affected.
Duration of interruption: Mon, 06/29/2026 - 23:00
Duration of interruption: Wed, 08/05/2026 - 07:00
Impact:Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to buildings will remain available at all times.
Additional Information: Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]

Building affected:  024 - SMD - Simard - University 60
Shutdown details: Foundation waterproofing work on the south side of the building.
Duration of interruption: Mon, 07/13/2026 - 07:00
Duration of interruption: Fri, 07/24/2026 - 17:00 
Impact: Noise disturbance.
Additional Information: Fencing has been installed to keep pedestrians away from the work area. 
For more information, please contact: Justin Champagne at [email protected]

Building affected:  061 - FHS - Faculty of Health Sciences - Lees 200
Shutdown details: Floor Maintenance and Spring Cleaning
Duration of interruption: Thu, 07/16/2026 - 23:00
Duration of interruption: Wed, 10/07/2026 - 07:00
Impact:Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to the building will remain available at all times.
Additional Information: Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]

Building affected:  030 - STN - Stanton Residence - University 100
Shutdown details: Preventive maintenance of elevators
Duration of interruption: Thu, 07/23/2026 - 07:30
Duration of interruption: Thu, 07/23/2026 - 16:00
Impact:The elevators will be out of service during the day. The pumps and exhaust fan will be turned off for two hours in the morning.
Additional Information: As part of maintenance work, a power outage is planned in the residence to connect the new ATS system.
For more information, please contact: Craig Quesnel at [email protected]a

Building affected:  All uOttawa buildings
Shutdown details: Province-wide electrical voltage reduction testing
Duration of interruption: Thu, 07/23/2026 - 09:00
Duration of interruption: Thu, 07/23/2026 - 14:00
Impact:Equipment sensitive to voltage fluctuations, as well as lighting (which may dim slightly), may be affected.
Additional Information: Province-wide voltage reduction testing (between 3% and 5% reduction) will be conducted. Please refer to the schedule below for affected areas. 
For more information, please contact: Javier Calle at [email protected]

Building affected:  All uOttawa buildings
Shutdown details: Province-wide electrical voltage reduction testing
Duration of interruption: Thu, 07/23/2026 - 09:00
Duration of interruption: Thu, 07/23/2026 - 14:00
Impact:Equipment sensitive to voltage fluctuations, as well as lighting (which may dim slightly), may be affected.
Additional Information: Province-wide voltage reduction testing (between 3% and 5% reduction) will be conducted. Please refer to the schedule below for affected areas. 
For more information, please contact: Javier Calle at [email protected]

Building affected:  033 - DMS - Desmarais - Laurier 55
Shutdown details: Reduced ventilation system capacity
Duration of interruption: Fri, 07/24/2026 - 12:00
Duration of interruption: Mon, 08/31/2026 - 16:00
Impact: Cooling capacity may be limited during periods of peak heat temperature.
Additional Information: Chiller 2 is out of service due to a failed control board and will remain unavailable until repairs are completed. Cooling will continue to be provided by Chiller 1; however, cooling capacity may be reduced during peak heat periods. Please refer to the schedule below for affected areas.
For more information, please contact: Salam Cheikh at [email protected]

Building affected:  028 - MRN - Marion - Louis Pasteur 140
Shutdown details: Closure of Emergency Stairwells
Duration of interruption: Mon, 07/27/2026 - 07:00
Duration of interruption: Wed, 08/05/2026 - 16:00
Impact:Access to the emergency stairwells located near rooms MRN 134, MRN 300, and CRG 409 will be closed for the duration of the construction work.
Additional Information: As part of the planned work, access to the emergency stairwells serving rooms MRN 134, MRN 300, and CRG 409 will be temporarily restricted. Access restrictions will remain in effect for the duration of the work. Building occupants must use the designated alternate routes to ensure their safety while moving through the building. 
For more information, please contact: Frederic Jutras at [email protected]

Building affected:  009 - LPR - Louis Pasteur - Louis Pasteur 141
Shutdown details: Entrance mat system modification and entrance door repairs.
Duration of interruption: Mon, 07/27/2026 - 07:00
Duration of interruption: Fri, 08/21/2026 - 17:00
Impact:Temporary closure of the entrance (Room 150) located at 129 Louis-Pasteur Private and noise disturbance.
Additional Information: Detour signage will be posted on site. Users may access the building through the Parking Services entrance at 139 Louis-Pasteur Private and use Stairwell F to reach the second floor. Please refer to the schedule below for affected areas. Please refer to the schedule below for affected areas.
For more information, please contact: Justin Champagne at [email protected]

Building affected:  004 - TBT - Tabaret - Cumberland 550
Duration of interruption: Mon, 07/27/2026 - 05:00
Duration of interruption: Fri, 07/31/2026 - 18:00
Impact: Higher-than-usual noise levels and temporary disruptions are to be expected during normal working hours.
For more information, please contact: Kyle Clemens at [email protected]

Building affected:  048 - STM - STEM Complex - Louis Pasteur 150
Shutdown details: Emergency Power Testing (ATS)
Duration of interruption: Tue, 07/28/2026 - 07:00
Duration of interruption: Tue, 07/28/2026 - 08:00
Impact:Brief power outages may occur during the testing period. Elevators may stop momentarily or reset, and some systems or equipment may shut down and then restart automatically.
Additional Information: Tests will be conducted on the Emergency Power Testing (ATS) for the building’s emergency power supply circuits. During these tests, brief power outages or temporary flickering may occur while the emergency power systems take over.
For more information, please contact: Frédérique Benoit at [email protected]

Building affected:  048 - STM - STEM Complex - Louis Pasteur 150
Shutdown details: Complete electrical power interruption.
Duration of interruption: Thu, 07/30/2026 - 05:00
Duration of interruption: Thu, 07/30/2026 - 08:00
Impact: All electrical circuits, power outlets, and lighting on Floors 4, to 6 will be out of service.
Additional Information: Circuits and lighting connected to the emergency power system will not be affected and will remain operational..
For more information, please contact: Alexandros Reklitis at [email protected]

Elevator and lift interruptions

Affected location: 040 STE
Elevator #: P1
Anticipated date of service restoration: November 30
Alternative: Additional elevators available on-site. 

Affected location: 774 FRL
Elevator #: P1
Anticipated date of service restoration: September 1
Alternative: Additional elevators available on-site. 

Affected location: 028 MRN
Elevator #: P1
Anticipated date of service restoration: July 31
Alternative: Additional elevators available on-site. 