Building affected: LMX-CRX - Lamoureux & Learning Crossroads - Jean-Jacques Lussier 145
Shutdown details: The door will be inaccessible due to emergency maintenance work
Duration of interruption: Thu, 03/26/2026 - 10:00
Duration of interruption: TBD
Impact: Occupants requiring an accessible entrance will need to use the main CRX entrance
For more information, please contact: : Patrick Labrèche at [email protected]
Building affected: Please find the list of affected buildings below
Shutdown details: Floor maintenance and spring cleaning
Impact: Areas will not be accessible between 11:00 PM and 7:00 AM as per the schedule. Work may take 1 to 2 days per area. No impact on access during daytime hours.
Additional Information: Work will be carried out overnight on a rotating schedule by area.
| Buildings affected | Duration of interruption | Rooms |
|---|
| DMS, HGN, SMN | Mon, 05/04/2026 - 23:00 to Tue, 07/28/2026 - 07:00 | View schedule |
For more information, please contact: Team RSS au [email protected]
Building affected: 004 - TBT - Tabaret - Cumberland 550
Shutdown details: Floor Maintenance and Spring Cleaning
Duration of interruption: lun, 06/15/2026 - 23:00
Duration of interruption: mer, 07/01/2026 - 07:00
Impact: Areas will not be accessible from 11:00 p.m. to 7:00 a.m. Work may take 1 to 2 days per area. No impact on daytime access to the areas..
Additional Information: : Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]
Building affected: 0025 - VNR - Vanier - Jean‐Jacques Lussier 136
Shutdown details: Floor Maintenance and Annual Cleaning
Duration of interruption: Mon, 06/15/2026 - 23:00
Duration of interruption: Wed, 07/15/2026 - 07:00
Impact: Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to the building will remain available at all times.
Additional Information: : Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]
Building affected: 060E - Lees 200 ‐ Bloc E
Shutdown details: Floor Maintenance and Spring Cleaning
Duration of interruption: Tue, 06/16/2026 - 23:00
Duration of interruption: Fri, 07/03/2026 - 07:00
Impact: Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to the building will remain available at all times..
Additional Information: : Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]
Building affected: MULTIPLE buildings will be affected – ARC - CBY - STE
Shutdown details: Floor Maintenance and Annual Cleaning
Duration of interruption: Tue, 06/16/2026 - 23:00
Duration of interruption: Fri, 08/28/2026 - 07:00
Impact: Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to buildings will remain available at all times..
Additional Information: : Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]
Building affected: MULTIPLE buildings will be affected – DRO - MCE - STM
Shutdown details: Floor Maintenance and Annual Cleaning
Duration of interruption: Wed, 06/17/2026 - 23:00
Duration of interruption: Tue, 08/18/2026 - 07:00
Impact: Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to buildings will remain available at all times..
Additional Information: : Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]
Building affected: 008 - UCU - University Centre - University 85
Shutdown details: Complete electrical shutdown of normal power circuits. Emergency power will not be affected.
Duration of interruption: Sat, 06/20/2026 - 07:00
Duration of interruption: Sat, 06/20/2026 - 16:00
Impact: Building Closure – Electrical Shutdown.
Additional Information: Full building electrical shutdown. Emergency power will remain operational.
For more information, please contact: Richard Normand at [email protected]
Building affected: Please find the list of affected buildings below
Shutdown details: Entrance Grate Cleaning
Impact: Areas will not be accessible between 7:00 A.M and 3:00 PM as per the schedule. Work may take 1 to 2 days per area.
Additional Information: A team will be present at the building entrance to clean the entrance grates.
| Buildings affected | Duration of interruption | Rooms |
| DMS, TBT, SMN | Mon, 06/29/2026 - Fri, 07/03/2026 | 033 - DMS; 004 - TBT; 001 - SMN |
Building affected: 024 - SMD - Simard - University 60
Shutdown details: Electrical circuits on normal power, complete electrical interruption, panel shutdown. Emergency power will not be affected
Duration of interruption: Sat, 06/27/2026 - 07:00
Duration of interruption: Sat, 06/27/2026 - 16:00
Impact:There will be no electricity, water, or elevator service during the work. Some areas will have restricted access, and all equipment will be shut down..
Additional Information: : Hamelin Building will also be affected. Preventive maintenance will be performed on the main vault. All equipment not connected to the emergency power circuit will be affected.
For more information, please contact: Timmy Laroche at [email protected]
Building affected: MULTIPLE buildings will be affected – BSC - GNN - MRN
Shutdown details: Complete electrical shutdown of normal power circuits. Emergency power will not be affected.
Duration of interruption: Mon, 06/29/2026 - 23:00
Duration of interruption: Wed, 08/05/2026 - 07:00
Impact:Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to buildings will remain available at all times.
Additional Information: Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]
Building affected: 012 - PRZ - Pérez - University 50
Shutdown details: Entrance Grate Cleaning
Duration of interruption: lun, 07/06/2026 - 07:00
Duration of interruption: ven, 07/10/2026 - 15:00
Impact: A team will be present at the building entrance to clean the entrance grates.
For more information, please contact: Raphaël Pilon at [email protected]
Building affected: 007 - MRT - Morisset - University 65
Shutdown details: Entrance Grate Cleaning
Duration of interruption: lun, 07/06/2026 - 07:00
Duration of interruption: ven, 07/10/2026 - 15:00
Impact: A team will be present at the building entrance to clean the entrance grates.
For more information, please contact: Raphaël Pilon at [email protected]
Building affected: 006 - MHN - Hamelin - Laurier 70
Shutdown details: Entrance Grate Cleaning
Duration of interruption: lun, 07/06/2026 - 07:00
Duration of interruption: ven, 07/10/2026 - 16:00
Impact: A team will be present at the building entrance to clean the entrance grates.
For more information, please contact: Raphaël Pilon at [email protected]
Building affected: 013 - 90U - Residence - University 90
Shutdown details: Building entrance
Duration of interruption: Tue, 07/07/2026 - 07:00
Duration of interruption: Fri, 07/10/2026 - 16:00
Impact:A team will be present at the building entrance to clean the entrance grates.
For more information, please contact: Raphaël Pilon at [email protected]
Building affected: 025 - VNR - Vanier - Jean‐Jacques Lussier 136
Shutdown details: Loading Dock Access Restriction
Duration of interruption: Wed, 07/08/2026 - 07:00
Duration of interruption: Wed, 07/08/2026 - 16:30
Impact:Access to the loading dock will be restricted during the work. Deliveries should be rerouted or cancelled for the day.
Additional Information: A crane will be set up at the Vanier loading dock on Wednesday, July 8 starting at 7:00 a.m. and may remain in place for the entire day. The crane will be used to lift new railings to the roof, and access to the loading dock will be restricted during this time for safety reasons. Assistance from Protection will be required to control traffic and ensure safety in the area. Deliveries should be rerouted or cancelled for the day.
For more information, please contact: Thomas MacIntosh at [email protected]
Building affected: 004 - TBT - Tabaret - Cumberland 550
Shutdown details: Flooring work
Duration of interruption: Wed, 07/08/2026 - 07:00
Duration of interruption: Fri, 07/24/2026 - 16:30
Impact: Limited access to the Grande Allée and controlled access to east-facing entrances.
Additional Information: During the period indicated above, regular material deliveries will take place along the Grande Allée. The TBT Grande Allée will be partially inaccessible during these deliveries. Access to east-facing entrances will be controlled by the contractor.Please refer to the schedule below for affected areas.
For more information, please contact: Kyle Clemens at [email protected]
Building affected: 008 - UCU - University Centre - University 85
Shutdown details: Flooring work
Duration of interruption: Mon, 07/13/2026 - 06:00
Duration of interruption: Wed, 07/15/2026 - 17:00
Impact: No access between the Terrace and UCU at room 201B on the second floor.
Additional Information: Please use another entrance during the flooring work.Please refer to the schedule below for affected areas.
For more information, please contact: Dongxu Liu at [email protected]
Building affected: 039 - MNO - Minto Sports Complex - King Edward 801
Shutdown details: Bleacher Access Restriction
Duration of interruption: Mon, 07/13/2026 - 06:00
Duration of interruption: Wed, 07/15/2026 - 17:00
Impact:The bleachers will be closed and inaccessible. Please keep a safe distance from the work area along the edge of the field..
Additional Information:Please refer to the schedule below for affected areas.
For more information, please contact: Dongxu Liu at [email protected]
Building affected: 061 - FHS - Faculty of Health Sciences - Lees 200
Shutdown details: Floor Maintenance and Spring Cleaning
Duration of interruption: Thu, 07/16/2026 - 23:00
Duration of interruption: Wed, 10/07/2026 - 07:00
Impact:Temporary circulation adjustments may occur near work areas. Some access points may be partially redirected or narrowed, but access to the building will remain available at all times.
Additional Information: Please refer to the schedule below for affected areas.
For more information, please contact: Team RSS at [email protected]