Building affected: VNR - Vanier - Jean-Jacques Lussier 136
Shutdown Details: Entrance #1014 will be closed and staircase B will not be accessible from Level 0 to the 2nd floor.
Duration of interruption: Wed, 08/20/2025 - 07:00
Duration of interruption: Fri, 08/22/2025 - 17:00
Impact: Please use alternate entrance doors located at Vanier #1070, #1000D, and use the elevators or staircases A, C, or E to access lower/upper levels
Alternative route: Not applicable for this shutdown.
For more information, please contact: Nicolas Diver at [email protected].
Building affected: LPR - Louis Pasteur 141
Shutdown Details: Back exterior entrance.
Duration of interruption: Fri, 08/22/2025 - 07:00
Duration of interruption: Sat, 08/23/2025 - 17:00
Impact: Back entrance to LPR at 720 King Edward will be closed.
Alternative route: Use the entrance at 141 Louis Pasteur Private to access the building and the post office.
For more information, please contact: Nicolas Diver at [email protected].
Building affected: MNO - Minto Sports Complex
Shutdown Details: The building will be closed for an electrical shutdown.
Duration of interruption: Sun, 08/24/2025 - 06:00
Duration of interruption: Sun, 08/24/2025 - 12:00
Impact: There will be no access to the building at all throughout the duration of the shutdown.
Alternative route: Not applicable for this shutdown.
For more information, please contact: Christopher Bruce at [email protected].
Building affected: MRT - Morisset - University 65
Shutdown Details: The normal electrical circuits on the first floor will be turned off.
Start of interruption: Mon, 08/25/2025 - 06:00
End of interruption: Mon, 08/25/2025 - 06:30
Impact: There will be no power on the first floor during the duration of the work.
Alternative route: Not applicable for this shutdown.
For more information, please contact: Tim Lacombe at [email protected].
Building affected: MBSC - Biosciences - Marie Curie 30 | PRZ - Pérez - Université 50
Shutdown Details: Window cleaning
Duration of interruption: Mon, 08/25/2025 - 06:00
Duration of interruption: Fri, 08/29/2025 - 16:00
Impact: The buildings above will remain accessible throughout the work. There will be no impact on building access during the day.
Alternative route: Not applicable for this shutdown.
Additional Information: Please remove all objects from the windowsills. There might be a faint chemical odor in the air for the first 48 hours after maintenance.
For more information, please contact:Team RSS at [email protected].
Building affected: ARC - Advanced Research Complex - Templeton 25
Shutdown Details: There will be a water shutdown
Duration of interruption: Wed, 08/27/2025 - 06:00
Duration of interruption: Wed, 08/27/2025 - 08:00
Impact: The domestic hot and cold water will not be available during the hours above. The water will be restored before users are in the labs
Alternative route: Not applicable for this shutdown.
For more information, please contact:Devin McGirr at [email protected]
Building affected: ARC - Advanced Research Complex - Templeton 25
Shutdown Details: The High Pressure Vacuum (HPV) system will be turned off.
Duration of interruption: Wed, 08/27/2025 - 07:00
Duration of interruption: Wed, 08/27/2025 - 15:00
Impact: No impact to regular users of the building, but the HPV system in labs will not be available throughout the day.
Alternative route: Not applicable for this shutdown.
For more information, please contact:Devin McGirr at [email protected]
Building affected: STE - SITE - King Edward 800
Shutdown Details: Entrance Closure
Duration of interruption: Mon, 08/25/2025 - 07:00
Duration of interruption: Fri, 10/17/2025 - 17:00
Impact: The main building entrance at level 00 will be closed and an alternative entrance will be provided during the time period. Refer to the document attached for details.
Alternative route: Not applicable for this shutdown.
For more information, please contact:Christian Gremli at [email protected]
Floor Grilles |
---|
Timeframe: Mon, 08/18/2025 - 07:00 to Fri, 08/22/2025 - 17:00 | Timeframe: Mon, 08/25/2025 - 07:00 to Fri, 08/29/2025 - 17:00 | Timeframe: Tue, 09/02/2025 - 07:00 to Fri, 09/05/2025 - 17:00 |
Buildings affected: BSC - Bioscience - Marie Curie 30 - LMX-CRX - Lamoureux - Carrefour des apprentissages - Jean-Jacques-Lussier 145
- VNR - Vanier - Jean-Jacques-Lussier 136
- FSS - Faculté des sciences sociales - Université 120
- CRG - Careg - Marie-Curie 20
- GNN - Gendron - Marie-Curie 30
- MRN - Marion - Louis-Pasteur 140
- DRO - D'Iorio - Marie-Curie 10
- STM - Complexe STEM - Louis-Pasteur 150
| Buildings affected: - BSC - Bioscience - Marie Curie 30
- CBY - Colonel By - Louis-Pasteur 161
- ARC - Advanced Research Complex - Templeton 25
- STE - SITE - King Edward 800
- BRS - Brooks Complex - Thomas More 100
- FTX - Fauteux - Louis-Pasteur 57
- King Edward 800
| Building affected: - GSD - GSAED - Cumberland 601
|
Shutdown details: Some sections of floor grills will be removed for cleaning.
Impact: A security perimeter will be installed and certain doors will not be accessible. However, access to the building will not be compromised and entry will remain possible.
Alternative route: Not applicable for this shutdown.
For more information, please contact: Nicolas Diver at [email protected].
Floor Maintenance:
LMX-CRX - Lamoureux-Learning Crossroads (Jean-Jacques Lussier 145): Sun, 07/13/2025 to Fri, 09/05/2025
GNN - Gendron (Marie Curie 30): Jeu, 07/31/2025 to Jeu, 08/28/2025
CBY - Colonel By (Louis Pasteur 161): Thu, 07/31/2025 to Thu, 08/28/2025
STE - SITE (King Edward 800): Thu, 07/31/2025 to Thu, 08/28/2025
VNR - Vanier (Jean-Jacques Lussier 136): Thu, 07/31/2025 to Thu, 08/28/2025
FHS - Faculty of Health Sciences (Lees 200): Mon, 08/04/2025 to Thu, 08/28/2025
30-32 Stewart: Fri, 08/22/2025 to Fri, 08/29/2025
34-36 Stewart: Mon, 09/01/2025 to Sat, 09/06/2025
LMX-CRX - Lamoureux - Learning Crossroads (Jean-Jacques Lussier 145): Thu, 09/04/2025 to Fri, 09/05/2025
RGN - Roger Guindon (Smyth 451): Mon, 09/08-2025 to Fri, 09/19/2025
Impact: The premises will not be accessible from 23:00 to 07:00. Work may last up to two days. There will be no impact on access to the building during the day.
Additional information: Please remove all personal belongings from the floor. A slight chemical odor may be present in the air for the first 48 hours following maintenance.
Alternative route: Not applicable for this shutdown.
For more information, please contact: Team RSS at [email protected].