The university provides notice of service interruption in the event of a planned or unexpected disruption in the facilities or services typically used by people with disabilities to access campus goods and services. 

About service alerts and interruptions

Notices of service interruption include the reason for the disruption, the anticipated duration, a description of alternate facilities or services (if available), as well as accessible routes for making one’s way to these alternate facilities and services. The notice is placed in conspicuous campus locations and, when appropriate, on this site.

The University of Ottawa is proud to offer an inclusive environment to its entire community. We invite you to send us comments and suggestions on accessibility that will help us to keep on improving the level of accessibility campus-wide.  For more information on accessibility at the University of Ottawa, please visit the Accessibility Hub.

The Accessibility for Ontarians with Disabilities Act states that all employers must provide emergency response information in an accessible format to all employees with a disability that requires an accommodation. If an employee has an emergency response plan in place, please ensure that you revisit the emergency response plan with the employee in light of the temporary disruptions/maintenance. If an employee submits a new request for an accommodation due to a disability, the employee should discussion their request with their supervisor and/or the Human Resources Department.

If employees require advice on emergency preparedness or assistance with developing a personal emergency plan, they should inform their supervisor and/or the Human Resources Department. The Emergency Management Office may be consulted should subject matter expertise be required.

Long term interruptions

Long term interruption notices are mostly due to construction projects on campus.

Alta Vista Campus 

Project: Construction of the Advanced Medical Research Centre
Project Manager: Sylviane Charette
Project Status: Active construction site
Alternative route: Not applicable for this project.
Related Interruption notices
Parking Lot H at RGN will close at midnight on May 10, 2024 and remain closed for the duration of construction (approx. October 2026).
Alternative parking is available for permit holders and visitors. View alternative options. 
When visiting the Alta vista campus, we strongly recommended using the uOttawa inter-campus shuttle service. 
Loading dock will remain open during construction.

STEM Complex (STM)-150 Louis Pasteur

Ongoing projects at this building:

Project: 048 - CFI Lessard (IF2023) - SSMART
Project Manager: Alexandros Reklitis
Project Status: Active construction site
Anticipated construction completion date: 9/25/2026
Alternative route: Not applicable for this project.
 

Parking Lot B

Project: Full closure of parking lot B.
Project Manager: Martin Faubert
Project Status: Active construction site
Alternative route: Not applicable for this project.
Related Interruption notices
Parking Lot B will close at 7:00 am on April 27, 2026 and remain closed for the duration of construction (approx. October 2026).
Building envelope work will take place at 143-145 Séraphin-Marion and Alex Trebek Hall, as well as a drainage system installation in parking lot B. Parking office will reach out to parking pass holders to provide alternate parking. Please see attached document

Montpetit Hall (MNT) - University 125

Project: Construction work will occur in both locker rooms on level 0
Project Manager: Dongxu Liu 
Project Status: Active 
Alternative route: Not applicable for this project.
Related Interruption notices
Locker access in both changing rooms on level 0 will be impacted. Some lockers will be temporarily removed. The existing access gates will also be blocked. Please see attached floor plan for alternate routes. Signage will also be posted on-site to direct traffic. 

Tabaret Hall (TBT) - Cumberland 550

Project: Occupation of a portion of the Great Lawn and Rotunda (level 1)
Project Manager: Kyle Clemens 
Project Status: Active 
Alternative route: Not applicable for this project.
Related Interruption notices
We will be occupying a large portion of the Tabaret Great Lawn during the construction period; therefore, that area will be inaccessible to campus occupants. We will also be occupying a portion of the Tabaret Rotunda on Level 1 with a scaffolding tower. All entrances will remain operational during the construction, with the exception of specific shutdowns that will be coordinated with facility management and building occupant representatives. Wayfinding and signage will be posted

Project: Noisy or disruptive construction activities outside regular working hours
Project Manager: Kyle Clemens 
Project Status: Active 
Alternative route: Not applicable for this project.
Related Interruption notices
Elevated noise levels and temporary disruptions may occur during the work period. These activities will take place outside regular working hours for the duration of the construction project. No building systems will be affected

Louis-Pasteur Street (between University Private and Thomas More Private)

Project: Partial then full closure of Louis-Pasteur Street between University Private and Thomas More Private
Project Manager: Martin Faubert 
Project Status: Active 
Alternative route: see details below
Related Interruption notices
From May 4 to May 10, 2026, one lane on Louis-Pasteur Street between University Private and Thomas More Private will be reduced to allow for work.

  • From May 11 to August 6, 2026, Louis-Pasteur Street between University Private and Thomas More Private will be fully closed, affecting vehicle traffic on campus. The sidewalk on the Brooks Residence side will remain open for pedestrian access.
  • An alternate route will be in place Monday to Friday from 7:30 a.m. to 5:30 p.m. to allow limited vehicle access on campus. Vehicle access to Louis-Pasteur Street via Marie-Curie Private will not be possible outside of these hours.From May 4 to May 10, 2026, one lane on Louis-Pasteur Street between University Private and Thomas More Private will be reduced to allow for work.
  • From May 11 to August 6, 2026, Louis-Pasteur Street between University Private and Thomas More Private will be fully closed, affecting vehicle traffic on campus. The sidewalk on the Brooks Residence side will remain open for pedestrian access.
  • An alternate route will be in place Monday to Friday from 7:30 a.m. to 5:30 p.m. to allow limited vehicle access on campus. Vehicle access to Louis-Pasteur Street via Marie-Curie Private will not be possible outside of these hours.

    Please refer to the attached document for more details

Short term interruptions

Building affected: 048 - STM - STEM Complex - Louis Pasteur 150
Start of interruption (MM/DD/YYYY HH:MM): Thu, 09/24/2026 - 11:30
End of interruption (MM/DD/YYYY HH:MM): Wed, 11/04/2026 - 11:30
System affected: Mechanical
Shutdown details: Exhaust Ventilation reduction
Impact: Fume hood exhaust may be reduced in all wet labs, particularly during peak loads.
Additional information: One of three main exhaust fans serving the wet labs in STEM has failed. Two fans remain operational.
For more information, please contact: Jason Truax at [email protected] 

Area affected: Cumberland street between Seraphin-Marion and Stewart
Start of interruption (MM/DD/YYYY HH:MM): Mon, 10/19/2026 - 05:00
End of interruption (MM/DD/YYYY HH:MM): Tue, 11/03/2026 - 17:00
Shutdown details: Street closure
Impact: Cumberland Street will be closed to vehicular traffic between Seraphin-Marion and Stewart streets for civil work. One sidewalk will remain open for pedestrians. 
For more information, please contact: Martin Faubert at [email protected]

Building affected: 004 - TBT - Tabaret - Cumberland 550
Start of interruption (MM/DD/YYYY HH:MM): Thu, 10/22/2026 - 07:00
End of interruption (MM/DD/YYYY HH:MM): Fri, 10/23/2026 - 17:00
Zone affected: Building entrances/inner courtyard
Impact: Access to and from the courtyard via Séraphin-Marion will be controlled. There may be periods of noise while work is underway.
Additional information: Concrete coring and hydrovac work will take place near the garbage bins in the courtyard. Flag persons will be present to manage access to and from the courtyard during the work. 
For more information, please contact: Christian Gremli at [email protected] 

Building affected: 022 - CRG - Bioscience‐Ph I,CAREG - Marie Curie 20
Start of interruption (MM/DD/YYYY HH:MM): Mon, 10/26/2026 - 07:00
End of interruption (MM/DD/YYYY HH:MM): Fri, 10/23/2026 - 16:00
System affected: Steam & condensate system
Impact: The building will be without heating and humidification, and autoclaves will be unavailable during the shutdown.
For more information, please contact: Philippe Millette at [email protected] 

Routine floor maintenance

Impact: Rooms listed in the charts below will be unavailable between 23h00 à 7h00 on the date specified. No impact on daytime access.
For more information, please contact: Team RSS at [email protected]


018 - CBY - Colonel By - Louis Pasteur 161
Start of interruption (MM/DD/YYYY HH:MM): Mon, 10/12/2026 - 23:00
End of interruption (MM/DD/YYYY HH:MM): Mon, 10/26/2026 - 07:00

Night ofRooms
12-Oct-26A02
12-Oct-26A012, A013, A015, A016, A017, A018, A020, A021, A022, A023, A024, A025, A027, A028, A030
13-Oct-26A05, A06, A08
13-Oct-26A09E
13-Oct-26A105, A108, A109, A110, A111, A112, A112A, A113, A114, A115, A116, A120A
14-Oct-26A204, A206, A208, A209, A210, A211, A212, A212A, A213, A214, A215, A216, A217, A219
14-Oct-26A306
14-Oct-26A324
15-Oct-26A325, A327, A328, A329, A330, A331, A332, A333, A333A, A334, A335, A336, A337, A339, A340, A341
18-Oct-26A406, A407, A408, A409, A410, A410A, A411, A413, A414, A415, A417, A418
18-Oct-26A503, A504
18-Oct-26A343, A344
19-Oct-26A506, A508, A509, A510, A511, A512, A512A, A513, A514, A515, A516, A519
19-Oct-26A604, A606, A609, A610
20-Oct-26B102A, B103A, B111A, B111C, B111D
20-Oct-26A611, A612, A613, A615, A617, A619, A620, A622
20-Oct-26A705, A713, A715
21-Oct-26B111E, B111G, B111J, B111K, B111L
21-Oct-26B203C, B203D, B203E, B203F, B203G, B207B, B207C, B210B
21-Oct-26B302B1, B307, B307B
22-Oct-26D108A, D108B
22-Oct-26B402A, B409A, C406A, C406B, C406C
22-Oct-26B508, B509, B518, C506
25-Oct-26E02A, E02B, E02C, E06
25-Oct-26D108C, D116B
25-Oct-26D202A
25-Oct-26D302B, D302C

048 - STM - STEM Complex - Louis Pasteur 150
Start of interruption (MM/DD/YYYY HH:MM): Mon, 10/12/2026 - 23:01
End of interruption (MM/DD/YYYY HH:MM): Mon, 10/26/2026 - 07:00

Night ofRooms
26-Oct-260109, 0110B, 0110C
26-Oct-261020A, 1020B, 1020G, 1020H, 1020J, 1020K, 1020L, 1024B, 1024E, 1024F, 1024G, 1024J, 1024K
26-Oct-261024L, 1024M, 1024N, 1024P, 1024Q, 1024R, 1024S
26-Oct-262002A, 2003, 2004, 2005, 2006, 2007, 2050
26-Oct-263005, 3007, 3020, 3021, 3022, 3030, 3031, 3032, 3051A, 3051B, 3051C
26-Oct-264003, 4009A, 4009B, 4009C, 4009D, 4009E
26-Oct-261024T
26-Oct-264009F, 4020, 4021, 4022, 4023, 4025, 4036, 4037, 4038, 4040, 4041, 4042, 4043, 4044, 4045, 4046, 4047, 4048, 4049, 4050, 4060, 4061, 4062, 4063, 4064, 4065, 4066, 4067, 4068, 4069, 4070, 4071
26-Oct-264073, 4074, 4075
26-Oct-265001, 5002, 5003, 5004, 5005, 5006, 5007, 5008, 5009, 5010, 5011, 5012, 5013, 5014, 5015, 5016, 5017, 5019, 5021, 5023, 5025, 5026A, 5026B, 5026C, 5026D, 5026E, 5027, 5029, 5031, 5033
26-Oct-265035, 5037, 5039, 5040A, 5041, 5043, 5060, 5062, 5064, 5066, 5068, 5070, 5072, 5074, 5076, 5078, 5080, 5082, 5094, 5096, 5098, 5100, 5102, 5104, 5106, 5108, 5109, 5110, 5116, 5118

027 - GNN - Bioscience‐Ph III, Gendron - Marie Curie 30
Start of interruption (MM/DD/YYYY HH:MM): Tue, 10/20/2026 - 23:00
End of interruption (MM/DD/YYYY HH:MM): Fri, 10/23/2026 - 07:00

Night ofRooms
20-Oct-26160A, 160B, 160C, 160D, 170A, 170B, 171B, 171C, 171D, 171E, 171F, 171G, 180A, 180B, 180C, 180D
21-Oct-26181A
21-Oct-26252, 256, 257, 258, 262, 270, 272, 273, 275, 276, 280, 281
21-Oct-26370, 372, 375
22-Oct-26376, 377
22-Oct-26450


153 - ARC - Advanced Research Complex - Templeton 25
Start of interruption (MM/DD/YYYY HH:MM): Wed, 10/21/2026 - 23:00
End of interruption (MM/DD/YYYY HH:MM): Wed, 10/28/2026 - 07:00

Night ofRooms
21-Oct-26118, 126, 152A
21-Oct-26208, 209
21-Oct-26307, 308, 309, 310, 311, 312, 313, 314, 315, 316, 317
22-Oct-26318, 319, 320, 321, 322, 323, 343, 344, 345, 346, 347, 348, 350A
22-Oct-26407, 408, 409
25-Oct-26410, 411, 412, 413, 414, 415, 416, 417, 418, 419, 420, 421, 422, 426D, 426E, 428A
26-Oct-26435A, 435B, 444A, 444B, 453, 455, 456, 461, 462, 463, 464
26-Oct-26505, 506
27-Oct-26507, 510, 511, 512, 513, 514, 537, 539, 540, 541, 542

040 - STE - SITE - King Edward 800
Start of interruption (MM/DD/YYYY HH:MM): Mon, 10/26/2026 - 23:00
End of interruption (MM/DD/YYYY HH:MM): Mon, 11/02/2026 - 07:00

Night ofRooms
26-Oct-260109, 0110B, 0110C
26-Oct-261020A, 1020B, 1020G, 1020H, 1020J, 1020K, 1020L, 1024B, 1024E, 1024F, 1024G, 1024J, 1024K
27-Oct-261024L, 1024M, 1024N, 1024P, 1024Q, 1024R, 1024S
27-Oct-262002A, 2003, 2004, 2005, 2006, 2007, 2050
27-Oct-263005, 3007, 3020, 3021, 3022, 3030, 3031, 3032, 3051A, 3051B, 3051C
27-Oct-264003, 4009A, 4009B, 4009C, 4009D, 4009E

042 - DRO - D'Iorio - Marie Curie 10
Start of interruption (MM/DD/YYYY HH:MM): Mon, 10/26/2026 - 23:00
End of interruption (MM/DD/YYYY HH:MM): Wed, 10/28/2026 - 07:00

Night ofRooms
26-Oct-26005, 023E
26-Oct-26105, 106, 107, 108, 116, 117, 118, 119, 120, 122, 124G
26-Oct-26201, 202, 203, 204
27-Oct-26205, 206, 207
27-Oct-26301, 302, 304, 305, 306, 308, 309, 310
27-Oct-26401, 403, 404, 406, 409, 425

043 - BSC - Bioscience‐Ph II - Marie Curie 30
Start of interruption (MM/DD/YYYY HH:MM): Wed, 10/28/2026 - 23:00
End of interruption (MM/DD/YYYY HH:MM): Thu, 10/29/2026 - 07:00

Night ofRooms
28-Oct-26102, 103, 104, 105, 106, 107, 108, 141A, 142, 143
28-Oct-26430, 431
28-Oct-26512A

Elevator and lift interruptions

Affected location: 745 - MNN - Mann Residence
Elevator #: P1
Anticipated date of service restoration: October 23
Alternative: Additional elevators available on-site.

Affected location: 017 BRS - Brooks - Thomas‐More 100
Elevator #: 2
Anticipated date of service restoration: October 23
Alternative: 

  • Accessible routes to the following areas are unavailable: 
    • Level 0 (Brooks parking garage)
    • Level 3
    • Level 4
  • Accessible exterior entrances
    • Enter the 1st floor of BRS using the ramp and the main doors off Thomas More Private on the north side of the building.
  • Accessible entrances from other buildings
    • Enter the 2nd floor of BRS through the 3rd floor of FTX by corridor 217.
  • Alternative accessible parking
    • Four accessible parking spaces are available on University Private between the south side of MNT and the north side of CRX.
    • Three accessible parking spaces are available on Louis-Pasteur Private on the west side of LPR.

Affected location: 034 FSS - 120 University
Elevator #: S7
Anticipated date of service restoration: October 15
Alternative: Additional elevators available on-site.

Affected location: 040 STE - 800 King Edward
Elevator #: P1
Anticipated date of service restoration: November 30
Alternative: Additional elevators available on-site.

Policy information