Road closure in progress

Interruption notices

The university provides notice of service interruption in the event of a planned or unexpected disruption in the facilities or services typically used by people with disabilities to access campus goods and services. 

About service alerts and interruptions

Notices of service interruption include the reason for the disruption, the anticipated duration, a description of alternate facilities or services (if available), as well as accessible routes for making one’s way to these alternate facilities and services. The notice is placed in conspicuous campus locations and, when appropriate, on this site.

The University of Ottawa is proud to offer an inclusive environment to its entire community. We invite you to send us comments and suggestions on accessibility that will help us to keep on improving the level of accessibility campus-wide.  For more information on accessibility at the University of Ottawa, please visit About Accessibility.

The Accessibility for Ontarians with Disabilities Act states that all employers must provide emergency response information in an accessible format to all employees with a disability that requires an accommodation. If an employee has an emergency response plan in place, please ensure that you revisit the emergency response plan with the employee in light of the temporary disruptions/maintenance. If an employee submits a new request for an accommodation due to a disability, the employee should discussion their request with their supervisor and/or the Human Resources Department.

If employees require advice on emergency preparedness or assistance with developing a personal emergency plan, they should inform their supervisor and/or the Human Resources Department. The Emergency Management Office may be consulted should subject matter expertise be required.

Active interruptions notices

Tabaret Hall

Phase 1 of the rehabilitation project for the Tabaret building Main Entrance is scheduled to begin on May 23rd, 2023. Phase 1 of this project includes the rehabilitation the main entrance portico roof, top landing and stairs. This project will also include a modernization of the rotunda.
 
The projected duration for Phase 1 is May 23, 2023 to February 2024. 
 
Please note that the closure of the entrances located on the East side of Tabaret Hall will be required for the duration of the construction. Signage will be posted on the premises to identify alternative means of egress.
 
Also note that the Tabaret Grand Allée will be inaccessible for the duration of the construction. The Tabaret Great Lawn will remain accessible.

Short term interruptions

Affected locations: STEM
Description of interruption: Electrical shutdown emergency power:8 Regular panels, Elevators, RO water purification system and pumps, Rheem water heater for non-potable water and pump, Dry system air compressor. The shut down is scheduled to last 10-15mins. Once completed, all system are to be turned back on immediately.
Alternative route: Not applicable for this shutdown
Service period: December 12 from 5:45 a.m. to 6:30 a.m.
For questions, please contact: [email protected]

Affected locations: RGN
Description of interruption: Hot water shutdown
Alternative route: Not applicable for this shutdown
Service period: January 3 from 6:00 a.m. to 11:30 a.m.
For questions, please contact: [email protected] 

Description of interruption: Blasting operations at 70 Nicholas Street (conducted by Groupe Blastforce Canada). Off campus construction, not managed by uOttawa.  
Impact: Blasting will be conducted intermittently Monday through Friday between 7:00 a.m. and 5:00 p.m. Blasting may cause vibrations to nearby buildings. All blasting vibration levels are being carefully monitored and will be followed by a series warning whistles that will be sounded to alert all persons in the vicinity.
Alternative route: Not applicable for this shutdown

Service period: Blasting will start the week of November 27, 2023 (weather permitting) and will last till end of February.
For questions, please contact: Paterson Group at 613-226-7381

Elevator and lift interruptions

Affected location: ARC - 25 Templeton
Elevator #:  P2
Anticipated date of service restoration: December 22
Alternative: Other elevator(s) are available on the premise. 

Affected location: FSS - 120 University 
Elevator #: P5
Anticipated date of service restoration: December 22
Alternative: Other elevator(s) are available on the premise.

Affected location: RGN - 451 Smyth
Elevator #: P1
Anticipated date of service restoration: December 22
Alternative: Other elevator(s) are available on the premise. 

Affected location: THN - 45 University
Elevator #: P2
Anticipated date of service restoration: December 15
Alternative: Other elevator(s) are available on the premise. 

Affected location: RGN - 451 Smyth
Elevator #: P3
Anticipated date of service restoration: December 22
Alternative: Other elevator(s) are available on the premise. 

Affected location: MRD - 110 University
Elevator #: P2
Anticipated date of service restoration: December 15