The Learning Centre

The Learning Centre will offer modern study rooms that will promote collaboration and exchanges between different disciplines.

Project Description

The Learning Centre will offer modern study rooms. It will include at least 1360 seats, with many more available in the several collaborative spaces and study halls found near the corridors on each floor; these spaces will promote collaboration and exchanges between different disciplines.

  • Construction of the Learning Centre will began in June 2015 and it will be open to students in 2018.
  • A 350-seat food services area will be available on the first floor.

Project Team

  • Project Manager: Marc-André Hogue
  • Architect: HDR Architecture Associates Inc.
  • Civil Engineer: Novatech Engineering Consultants Inc.
  • General Contractor: POMERLEAU
  • Landscape Architect: CSW Landscape Architects Inc.
  • Mechanical / Electrical Engineer: MMM Group Limited
  • Structural Engineer: Cleland Jardine Engineering Ltd.

Update

Please be advised that the pedestrian bridge linking Montpetit and Lamoureux will be unavailable from June 17th to the end of August 2017, while it is expanded to provide access to the future Learning Centre. While most of the heavy demolition will be scheduled after work hours, noise and vibrations are to be expected.

See the alternate route signs here (PDF)